Equipping the Metković Sorting Plant

Today, the company Tehnix signed a contract with the company Capital Engineering for equipping the sorting plant in Metković as part of the project RECONSTRUCTION OF WASTE LANDFILL

“DUBRAVICA”, PHASE 4, “Construction and equipping of a plant for sorting separately collected waste in Metković” KK.06.3.1.12.0004 which is co-financed from grants from the Cohesion Fund.

The signing ceremony was attended by the CEO of Tehnix, Mr. Đuro Horvat, and a member of the Management Board of Capital Engineering, Mr. Mario Bukmir.